w w w . m e c a l . c o m . a u
|
Job Stories |
| MECAL ACCEPTS THE CHALLENGE
MECAL has recently commissioned a magnetic steel handling system at a major steel distribution centre for the eastern states of Australia. Some of the challenging requirements of the client included: - crane driver only operation - steel slabs of 1.5 x 3.0 meter up to 9 tonnes - steel plates of 1.5 to 3.2 meter wide up to 12 meter long, in single or multiple stacks, up to 8.5 tonnes. To meet this challenge MECAL designed and manufactured a Magnet lifting beam consisting of 4 rectangular magnets and hydraulically operated telescoping arms so as to vary the position of the magnets. This new magnet system improved the productivity by a minimum of 500% when compared with the magnet beam that it replaced. MECAL would be pleased to discuss any challenging problem that you may have.
|
| MECAL PTY LTD 9 Paramount Road (PO Box 4140) West Footscray 3012 Melbourne Australia URL: http://www.mecal.com.au |
Phone: 03-9314-0144 Fax: 03-9314-2576 International |